This project involved a full reimagining of a traditional family home through a single storey front, side and rear extension, alongside a full loft conversion with a raised roof height. The aim was to create a more spacious, connected, and future-proof living environment—without needing to move house.
The extension introduces a welcoming entrance porch, a practical downstairs toilet, and a generous open-plan kitchen, dining and living area, complemented by a separate utility room. Above, the loft conversion—with a rear dormer—adds two well-proportioned bedrooms and a family bathroom, significantly increasing living space without compromising the footprint below.
To preserve existing bedroom space, the new staircase rises from the original first floor landing. Meanwhile, the smaller front bedroom has been adapted into a quiet, self-contained home office—offering flexibility for modern family life.
Enhancing Flow, Space and Daily Living
Seamless Ground Floor Living:
The side and rear extensions open up a bright, unified space for cooking, dining and relaxing. Large glazed doors to the garden provide natural light and a strong indoor-outdoor connection, creating a sociable heart to the home.
Dedicated Utility Room:
Accessed discreetly from the kitchen, the utility room offers a practical zone for laundry and storage—keeping household activity separate and helping to maintain calm and order in the main living areas.
Smart and Spacious Loft Conversion:
Raising the roof enabled the creation of a full-height loft with two new bedrooms and a family bathroom. Carefully placed dormer windows maximise light and headroom, while the layout ensures comfort and privacy.
No Compromise on Bedrooms:
The loft staircase has been designed to rise from the existing first floor landing, meaning no original rooms were lost or reduced. The transformation enhances the home without taking anything away.
Office Space:
The former smallest bedroom now serves as a calm and well-positioned home office—offering a quiet, dedicated space for study, reading, or professional work.
Staying Put and Adding Value
This project not only delivers the much-needed additional space for a growing family but does so in a way that allowed them to remain in the location they love—close to friends, community, and schools. By extending instead of relocating, the family avoided the upheaval of moving while gaining all the space they needed for the future.
The improvements have also significantly increased the value of the property, both in terms of functionality and market appeal. With more usable living space, modern layout, and high-quality finishes, this home now meets the demands of contemporary family life—with flexibility built in.
A Home Reimagined for Modern Living
This carefully considered renovation shows how extending both outwards and upwards can dramatically improve the function and feel of a family home. With enhanced space, better flow, and clearly defined zones for living, working and relaxing, the house now supports everyday life with clarity and comfort—without needing to leave the place you call home
Project Plans
Project Gallery
See Similar
Loft Conversion with Front & Rear Dormers – Sheffield S10 (Lodge Moor)
Loft Conversion with Front & Rea...
View Case Study
Dormer Loft Conversion and Open-Plan Ground Floor Extension in S11
Dormer Loft Conversion and Open-Plan ...
View Case Study
Dormer Loft Conversion with Internal Alterations
Dormer Loft Conversion with Internal ...
View Case StudyWhat Our Customers Say
Daryl C
We could not be happier with the service provided to plan a single story extension to serve as a bedroom for my Daughter. Al...
Rachel Field
Absolutely fantastic service from ben, he designed the perfect kitchen extension for us, fantastic communication, and ben wen...
qunhong song
Ben is very knowledgeable with what he does with his job . He has shown his professionalism through out the planning permissi...
Ian Patheyjohns
Ben was very friendly and helpful during the development stage, giving advice where required and producing a design that met ...
Ann S
Ben was really helpful and gave us lots of advice and ideas when designing our extension. He was patient and incredibly knowl...
Duncan White
Ben did a fantastic job preparing and submitting plans for the issuing of a certificate of legal development on a house I hav...
Oliver Leyland
Ben designed our loft conversion earlier this year. I can highly recommend his services. He is knowledgeable, polite, helpful...
David Evans
Great service from start to finish with regular updates and help always at hand.
Becky Virgo
Ben at Sheffield’s Extension Design has been really helpful, he listened to my quirky design ideas and tried to incorporate...
Nick Gascoyne
Brilliant from start to finish. Helped us through every stage offer support, assistance and advice. Highly knowledgeable and ...
Ty
I would highly recommend Extension Plans Sheffield for Architect Plans. They are totally professional, helpful and follow th...
Mohammed Hussain
Fantastic Architect – Highly Recommend! We worked with Ben over a long period and honestly couldn’t have asked for a bet...
Jenny Cork
Brilliant service. Ben was highly communicative and listened to all my ideas and thoughts before coming up with excellent des...
Vincent Cunliffe
Ben did a first class job on our project. He conducted an in-depth site visit, drew up detailed plans and liaised with the bu...
Francesca Makey
Ben provided a great service in getting plans for our loft conversion. Thanks!
Cliff Stacey
Ben is a very personable, knowledgeable and reliable young man. He kept us informed every step of the way during the process ...
Mr Modsiw78
Excellent service & would highly recommend. Always available to offer advice & explain the process & always on the end of the...
paul johnson
Ben drew up the plans for our lovely kitchen extension. He did a brilliant job, producing just what we needed and he also lia...
Chris F
We were really pleased with the drawings Ben did for our house extension. He was always fast to respond to questions, flexibl...
Hassan Khan
Was brilliant in implementing our ideas into reality, went to numerous other firms and architects who had required deposits t...
John Gilliver
Would highly recommend using this company, Ben was really helpful and made everything simple for us to complete our project ....
Carl Foxx
I have had a nightmare with my architect and contacted Ben as a last resort in hope of help. Messaged him at 9am and by 13:00...
alex hsufc
Very good communication all the way through the process of design and build. Always happy to help with any queries even after...
Michael Collyer
Extension Plans Sheffield have provided me with a professional and efficient service so far. They are always ready to answer ...
Jamie Smith
Very helpful with a professional approach. Dealt with everything to do with planning application which made it so easy for us...
Giles Moore
Fantastic to work with Ben, highly recommend them for any extension plans. They not only delivered everything really quickly ...
Daryl C
We could not be happier with the service provided to plan a single story extension to serve as a bedroom for my Daughter. Al...
Rachel Field
Absolutely fantastic service from ben, he designed the perfect kitchen extension for us, fantastic communication, and ben wen...
qunhong song
Ben is very knowledgeable with what he does with his job . He has shown his professionalism through out the planning permissi...
Ian Patheyjohns
Ben was very friendly and helpful during the development stage, giving advice where required and producing a design that met ...
Ann S
Ben was really helpful and gave us lots of advice and ideas when designing our extension. He was patient and incredibly knowl...
Duncan White
Ben did a fantastic job preparing and submitting plans for the issuing of a certificate of legal development on a house I hav...
Oliver Leyland
Ben designed our loft conversion earlier this year. I can highly recommend his services. He is knowledgeable, polite, helpful...
David Evans
Great service from start to finish with regular updates and help always at hand.
Becky Virgo
Ben at Sheffield’s Extension Design has been really helpful, he listened to my quirky design ideas and tried to incorporate...
Nick Gascoyne
Brilliant from start to finish. Helped us through every stage offer support, assistance and advice. Highly knowledgeable and ...
Ty
I would highly recommend Extension Plans Sheffield for Architect Plans. They are totally professional, helpful and follow th...
Mohammed Hussain
Fantastic Architect – Highly Recommend! We worked with Ben over a long period and honestly couldn’t have asked for a bet...
Jenny Cork
Brilliant service. Ben was highly communicative and listened to all my ideas and thoughts before coming up with excellent des...
Vincent Cunliffe
Ben did a first class job on our project. He conducted an in-depth site visit, drew up detailed plans and liaised with the bu...
Francesca Makey
Ben provided a great service in getting plans for our loft conversion. Thanks!
Cliff Stacey
Ben is a very personable, knowledgeable and reliable young man. He kept us informed every step of the way during the process ...
Mr Modsiw78
Excellent service & would highly recommend. Always available to offer advice & explain the process & always on the end of the...
paul johnson
Ben drew up the plans for our lovely kitchen extension. He did a brilliant job, producing just what we needed and he also lia...
Chris F
We were really pleased with the drawings Ben did for our house extension. He was always fast to respond to questions, flexibl...
Hassan Khan
Was brilliant in implementing our ideas into reality, went to numerous other firms and architects who had required deposits t...
John Gilliver
Would highly recommend using this company, Ben was really helpful and made everything simple for us to complete our project ....
Carl Foxx
I have had a nightmare with my architect and contacted Ben as a last resort in hope of help. Messaged him at 9am and by 13:00...
alex hsufc
Very good communication all the way through the process of design and build. Always happy to help with any queries even after...
Michael Collyer
Extension Plans Sheffield have provided me with a professional and efficient service so far. They are always ready to answer ...
Jamie Smith
Very helpful with a professional approach. Dealt with everything to do with planning application which made it so easy for us...
Giles Moore
Fantastic to work with Ben, highly recommend them for any extension plans. They not only delivered everything really quickly ...
Planning a single storey rear extension?
Choose our experienced and reputable professionals at Extension Plans Sheffield to ensure that your single storey rear extension is beautifully designed and enhances your living space.
If you’re looking for expert guidance on planning your extension, contact our team in Sheffield today!
FAQs
Do I need planning permission for a loft conversion
Where do loft conversion stairs go?
How much head height do I need for a loft conversion?
How long does the design and approval process take?
What will be included on the loft conversion plans?
Do you provide structural calculations and steelwork details?
What if my loft isn’t suitable for conversion?