This project involved the transformation of a traditional family home through a well-considered loft conversion, delivering much-needed additional space while preserving the character and proportions of the original property. With the existing loft space lacking sufficient headroom, we gained planning permission to raise the eaves and increase the roof pitch—creating the height required for a functional and comfortable new floor.

The conversion includes two new bedrooms and a family bathroom, adding valuable living space without altering the ground floor layout or extending the building footprint.

 

A Natural Continuation of the Original House

Thoughtful Roof Design:
The new roof structure was carefully designed to follow the lines and proportions of the existing house. By lifting the eaves and adjusting the roof pitch, we were able to introduce usable height discreetly, ensuring the extended roofline felt like a natural part of the original form—not an obvious alteration.

In-Keeping Materials and Detailing:
The full-width rear dormer has been finished in materials that complement the existing exterior, maintaining visual consistency from every angle. Window styles and roof finishes were matched or sensitively updated to ensure a cohesive appearance. The result is an addition that blends seamlessly with the property, rather than standing apart from it.

Respecting Scale and Symmetry:
Particular attention was paid to the rhythm and symmetry of the home’s existing elevations. The dormer sits comfortably within the rear roof slope, and proportions were balanced to avoid overwhelming the rear façade. This ensured the design enhances rather than detracts from the home’s character.

 

Smart, Space-Efficient Layout

No Loss of Existing Space:
The new staircase rises from the existing landing, with only a minor reconfiguration to the first-floor bathroom. This retained all original bedrooms and allowed the new floor to integrate effortlessly with the rest of the home.

Bright, Comfortable Rooms:
The two new bedrooms and bathroom benefit from generous ceiling heights and well-positioned windows that maximise natural light. The layout has been planned for practicality and privacy, creating comfortable spaces suitable for growing children or visiting guests.

 

More Space Without Moving
This project provided the space the family needed without the disruption and expense of moving house. Staying in the neighbourhood they enjoy, near schools and familiar routines, meant they could adapt their home to meet changing needs while retaining the location that works for them.

The conversion has added real value to the property—both financially and functionally. It’s a future-proof investment that delivers new living space, flexibility and comfort, all while staying true to the character of the original home.

Project Plans

Project Plans
Project Plans
Project Plans
Project Plans
Project Plans

Project Gallery

Loft Conversion in S6 with Raised Eaves and Increased Roof Pitch
Loft Conversion in S6 with Raised Eaves and Increased Roof Pitch
Loft Conversion in S6 with Raised Eaves and Increased Roof Pitch
Loft Conversion in S6 with Raised Eaves and Increased Roof Pitch
Loft Conversion in S6 with Raised Eaves and Increased Roof Pitch
Loft Conversion in S6 with Raised Eaves and Increased Roof Pitch
Extension Plans Sheffield

See Similar

Loft Conversion with Front & Rear Dormers – Sheffield S10 (Lodge Moor) thumbnail image

Loft Conversion with Front & Rear Dormers – Sheffield S10 (Lodge Moor)

Loft Conversion with Front & Rea...

View Case Study
Dormer Loft Conversion and Open-Plan Ground Floor Extension in S11 thumbnail image

Dormer Loft Conversion and Open-Plan Ground Floor Extension in S11

Dormer Loft Conversion and Open-Plan ...

View Case Study
Dormer Loft Conversion with Internal Alterations thumbnail image

Dormer Loft Conversion with Internal Alterations

Dormer Loft Conversion with Internal ...

View Case Study
Case Studies

What Our Customers Say

Reviewer Name

Daryl C

We could not be happier with the service provided to plan a single story extension to serve as a bedroom for my Daughter. Al...

Reviewer Name

Rachel Field

Absolutely fantastic service from ben, he designed the perfect kitchen extension for us, fantastic communication, and ben wen...

Reviewer Name

qunhong song

Ben is very knowledgeable with what he does with his job . He has shown his professionalism through out the planning permissi...

Reviewer Name

Ian Patheyjohns

Ben was very friendly and helpful during the development stage, giving advice where required and producing a design that met ...

Reviewer Name

Ann S

Ben was really helpful and gave us lots of advice and ideas when designing our extension. He was patient and incredibly knowl...

Reviewer Name

Duncan White

Ben did a fantastic job preparing and submitting plans for the issuing of a certificate of legal development on a house I hav...

Reviewer Name

Oliver Leyland

Ben designed our loft conversion earlier this year. I can highly recommend his services. He is knowledgeable, polite, helpful...

Reviewer Name

David Evans

Great service from start to finish with regular updates and help always at hand.

Reviewer Name

Becky Virgo

Ben at Sheffield’s Extension Design has been really helpful, he listened to my quirky design ideas and tried to incorporate...

Reviewer Name

Nick Gascoyne

Brilliant from start to finish. Helped us through every stage offer support, assistance and advice. Highly knowledgeable and ...

Reviewer Name

Ty

I would highly recommend Extension Plans Sheffield for Architect Plans. They are totally professional, helpful and follow th...

Reviewer Name

Mohammed Hussain

Fantastic Architect – Highly Recommend! We worked with Ben over a long period and honestly couldn’t have asked for a bet...

Reviewer Name

Jenny Cork

Brilliant service. Ben was highly communicative and listened to all my ideas and thoughts before coming up with excellent des...

Reviewer Name

Vincent Cunliffe

Ben did a first class job on our project. He conducted an in-depth site visit, drew up detailed plans and liaised with the bu...

Reviewer Name

Francesca Makey

Ben provided a great service in getting plans for our loft conversion. Thanks!

Reviewer Name

Cliff Stacey

Ben is a very personable, knowledgeable and reliable young man. He kept us informed every step of the way during the process ...

Reviewer Name

Mr Modsiw78

Excellent service & would highly recommend. Always available to offer advice & explain the process & always on the end of the...

Reviewer Name

paul johnson

Ben drew up the plans for our lovely kitchen extension. He did a brilliant job, producing just what we needed and he also lia...

Reviewer Name

Chris F

We were really pleased with the drawings Ben did for our house extension. He was always fast to respond to questions, flexibl...

Reviewer Name

Hassan Khan

Was brilliant in implementing our ideas into reality, went to numerous other firms and architects who had required deposits t...

Reviewer Name

John Gilliver

Would highly recommend using this company, Ben was really helpful and made everything simple for us to complete our project ....

Reviewer Name

Carl Foxx

I have had a nightmare with my architect and contacted Ben as a last resort in hope of help. Messaged him at 9am and by 13:00...

Reviewer Name

alex hsufc

Very good communication all the way through the process of design and build. Always happy to help with any queries even after...

Reviewer Name

Michael Collyer

Extension Plans Sheffield have provided me with a professional and efficient service so far. They are always ready to answer ...

Reviewer Name

Jamie Smith

Very helpful with a professional approach. Dealt with everything to do with planning application which made it so easy for us...

Reviewer Name

Giles Moore

Fantastic to work with Ben, highly recommend them for any extension plans. They not only delivered everything really quickly ...

Reviewer Name

Daryl C

We could not be happier with the service provided to plan a single story extension to serve as a bedroom for my Daughter. Al...

Reviewer Name

Rachel Field

Absolutely fantastic service from ben, he designed the perfect kitchen extension for us, fantastic communication, and ben wen...

Reviewer Name

qunhong song

Ben is very knowledgeable with what he does with his job . He has shown his professionalism through out the planning permissi...

Reviewer Name

Ian Patheyjohns

Ben was very friendly and helpful during the development stage, giving advice where required and producing a design that met ...

Reviewer Name

Ann S

Ben was really helpful and gave us lots of advice and ideas when designing our extension. He was patient and incredibly knowl...

Reviewer Name

Duncan White

Ben did a fantastic job preparing and submitting plans for the issuing of a certificate of legal development on a house I hav...

Reviewer Name

Oliver Leyland

Ben designed our loft conversion earlier this year. I can highly recommend his services. He is knowledgeable, polite, helpful...

Reviewer Name

David Evans

Great service from start to finish with regular updates and help always at hand.

Reviewer Name

Becky Virgo

Ben at Sheffield’s Extension Design has been really helpful, he listened to my quirky design ideas and tried to incorporate...

Reviewer Name

Nick Gascoyne

Brilliant from start to finish. Helped us through every stage offer support, assistance and advice. Highly knowledgeable and ...

Reviewer Name

Ty

I would highly recommend Extension Plans Sheffield for Architect Plans. They are totally professional, helpful and follow th...

Reviewer Name

Mohammed Hussain

Fantastic Architect – Highly Recommend! We worked with Ben over a long period and honestly couldn’t have asked for a bet...

Reviewer Name

Jenny Cork

Brilliant service. Ben was highly communicative and listened to all my ideas and thoughts before coming up with excellent des...

Reviewer Name

Vincent Cunliffe

Ben did a first class job on our project. He conducted an in-depth site visit, drew up detailed plans and liaised with the bu...

Reviewer Name

Francesca Makey

Ben provided a great service in getting plans for our loft conversion. Thanks!

Reviewer Name

Cliff Stacey

Ben is a very personable, knowledgeable and reliable young man. He kept us informed every step of the way during the process ...

Reviewer Name

Mr Modsiw78

Excellent service & would highly recommend. Always available to offer advice & explain the process & always on the end of the...

Reviewer Name

paul johnson

Ben drew up the plans for our lovely kitchen extension. He did a brilliant job, producing just what we needed and he also lia...

Reviewer Name

Chris F

We were really pleased with the drawings Ben did for our house extension. He was always fast to respond to questions, flexibl...

Reviewer Name

Hassan Khan

Was brilliant in implementing our ideas into reality, went to numerous other firms and architects who had required deposits t...

Reviewer Name

John Gilliver

Would highly recommend using this company, Ben was really helpful and made everything simple for us to complete our project ....

Reviewer Name

Carl Foxx

I have had a nightmare with my architect and contacted Ben as a last resort in hope of help. Messaged him at 9am and by 13:00...

Reviewer Name

alex hsufc

Very good communication all the way through the process of design and build. Always happy to help with any queries even after...

Reviewer Name

Michael Collyer

Extension Plans Sheffield have provided me with a professional and efficient service so far. They are always ready to answer ...

Reviewer Name

Jamie Smith

Very helpful with a professional approach. Dealt with everything to do with planning application which made it so easy for us...

Reviewer Name

Giles Moore

Fantastic to work with Ben, highly recommend them for any extension plans. They not only delivered everything really quickly ...

Planning a single storey rear extension?

Planning a single storey rear extension?

Choose our experienced and reputable professionals at Extension Plans Sheffield to ensure that your single storey rear extension is beautifully designed and enhances your living space.

If you’re looking for expert guidance on planning your extension, contact our team in Sheffield today!

 

Get in Touch

FAQs

Do I need planning permission for a loft conversion

Where do loft conversion stairs go?

How much head height do I need for a loft conversion?

How long does the design and approval process take?

What will be included on the loft conversion plans?

Do you provide structural calculations and steelwork details?

What if my loft isn’t suitable for conversion?