This project adds a rear and side extension to improve the kitchen layout and introduce a dedicated utility room, while also enhancing the external patio area for better outdoor living.
This project in S7 demonstrates how a thoughtfully designed rear and side extension can make a significant difference to everyday living. The aim was to improve the functionality of the kitchen while also introducing a separate utility room—without compromising the character of the original home.
Enhanced Layout and Functionality
The extension has enabled a more efficient kitchen layout, improving circulation, storage, and workspace. Large roof windows above the new kitchen area flood the space with natural light, creating a brighter, more welcoming environment throughout the day. The addition of a dedicated utility room further supports the home’s organisation—providing a discrete area for laundry and storage, and helping to keep the main kitchen space clear and clutter-free.
Structural Improvements and a Cohesive Finish
With the original garage roof in poor condition, the new extension roof was designed to continue seamlessly across it, incorporating new rafters for improved structure and durability. This not only strengthened the overall build but also created a unified roofline that enhances the appearance of the rear elevation.
In Keeping with the Original Home
Materials and proportions were carefully selected to ensure the extension blends seamlessly with the original property. Matching brickwork, complementary roof tiles, and considered detailing ensure the new spaces feel like a natural continuation of the existing house—rather than an obvious addition.
Smart Improvements with Long-Term Value
By delivering a more usable and enjoyable kitchen, improved storage, and a structurally sound rear elevation, this project has added real value to the property. The result is a more functional, brighter, and better-balanced home—suited to the demands of modern living while remaining in keeping with its original character.
Whole-Home Enhancements
In parallel with the extension works, the property underwent a number of additional upgrades to improve both energy performance and visual appeal. The old sliding doors at the rear were replaced with classic French doors, improving thermal efficiency while enhancing the connection to the garden. All existing windows were replaced with triple glazed units, significantly improving insulation and comfort throughout the year.
Externally, the rear garden was re-landscaped to include a more defined path and a new patio area, making better use of the outdoor space. At the front, a resin-bound driveway and a new electric garage door were installed—offering a modern, low-maintenance solution with strong kerb appeal.
Lasting Value and Usability
Together, these thoughtful additions and upgrades have improved how the home functions on a daily basis while also enhancing its overall performance, durability, and long-term value. The result is a home that now works better in every way—with a layout, aesthetic and level of efficiency fit for modern living.
Project Plans
Project Gallery
See Similar
Single-Storey Rear Extension – Sheffield S10, Fulwood Area
Single-Storey Rear Extension – Shef...
View Case Study
Two-Storey Side and Single-Storey Rear Extension – Sheffield S7, Millhouses
Two-Storey Side and Single-Storey Rea...
View Case StudyWhat Our Customers Say
Daryl C
We could not be happier with the service provided to plan a single story extension to serve as a bedroom for my Daughter. Al...
Rachel Field
Absolutely fantastic service from ben, he designed the perfect kitchen extension for us, fantastic communication, and ben wen...
qunhong song
Ben is very knowledgeable with what he does with his job . He has shown his professionalism through out the planning permissi...
Ian Patheyjohns
Ben was very friendly and helpful during the development stage, giving advice where required and producing a design that met ...
Ann S
Ben was really helpful and gave us lots of advice and ideas when designing our extension. He was patient and incredibly knowl...
Duncan White
Ben did a fantastic job preparing and submitting plans for the issuing of a certificate of legal development on a house I hav...
Oliver Leyland
Ben designed our loft conversion earlier this year. I can highly recommend his services. He is knowledgeable, polite, helpful...
David Evans
Great service from start to finish with regular updates and help always at hand.
Becky Virgo
Ben at Sheffield’s Extension Design has been really helpful, he listened to my quirky design ideas and tried to incorporate...
Nick Gascoyne
Brilliant from start to finish. Helped us through every stage offer support, assistance and advice. Highly knowledgeable and ...
Ty
I would highly recommend Extension Plans Sheffield for Architect Plans. They are totally professional, helpful and follow th...
Mohammed Hussain
Fantastic Architect – Highly Recommend! We worked with Ben over a long period and honestly couldn’t have asked for a bet...
Jenny Cork
Brilliant service. Ben was highly communicative and listened to all my ideas and thoughts before coming up with excellent des...
Vincent Cunliffe
Ben did a first class job on our project. He conducted an in-depth site visit, drew up detailed plans and liaised with the bu...
Francesca Makey
Ben provided a great service in getting plans for our loft conversion. Thanks!
Cliff Stacey
Ben is a very personable, knowledgeable and reliable young man. He kept us informed every step of the way during the process ...
Mr Modsiw78
Excellent service & would highly recommend. Always available to offer advice & explain the process & always on the end of the...
paul johnson
Ben drew up the plans for our lovely kitchen extension. He did a brilliant job, producing just what we needed and he also lia...
Chris F
We were really pleased with the drawings Ben did for our house extension. He was always fast to respond to questions, flexibl...
Hassan Khan
Was brilliant in implementing our ideas into reality, went to numerous other firms and architects who had required deposits t...
John Gilliver
Would highly recommend using this company, Ben was really helpful and made everything simple for us to complete our project ....
Carl Foxx
I have had a nightmare with my architect and contacted Ben as a last resort in hope of help. Messaged him at 9am and by 13:00...
alex hsufc
Very good communication all the way through the process of design and build. Always happy to help with any queries even after...
Michael Collyer
Extension Plans Sheffield have provided me with a professional and efficient service so far. They are always ready to answer ...
Jamie Smith
Very helpful with a professional approach. Dealt with everything to do with planning application which made it so easy for us...
Giles Moore
Fantastic to work with Ben, highly recommend them for any extension plans. They not only delivered everything really quickly ...
Daryl C
We could not be happier with the service provided to plan a single story extension to serve as a bedroom for my Daughter. Al...
Rachel Field
Absolutely fantastic service from ben, he designed the perfect kitchen extension for us, fantastic communication, and ben wen...
qunhong song
Ben is very knowledgeable with what he does with his job . He has shown his professionalism through out the planning permissi...
Ian Patheyjohns
Ben was very friendly and helpful during the development stage, giving advice where required and producing a design that met ...
Ann S
Ben was really helpful and gave us lots of advice and ideas when designing our extension. He was patient and incredibly knowl...
Duncan White
Ben did a fantastic job preparing and submitting plans for the issuing of a certificate of legal development on a house I hav...
Oliver Leyland
Ben designed our loft conversion earlier this year. I can highly recommend his services. He is knowledgeable, polite, helpful...
David Evans
Great service from start to finish with regular updates and help always at hand.
Becky Virgo
Ben at Sheffield’s Extension Design has been really helpful, he listened to my quirky design ideas and tried to incorporate...
Nick Gascoyne
Brilliant from start to finish. Helped us through every stage offer support, assistance and advice. Highly knowledgeable and ...
Ty
I would highly recommend Extension Plans Sheffield for Architect Plans. They are totally professional, helpful and follow th...
Mohammed Hussain
Fantastic Architect – Highly Recommend! We worked with Ben over a long period and honestly couldn’t have asked for a bet...
Jenny Cork
Brilliant service. Ben was highly communicative and listened to all my ideas and thoughts before coming up with excellent des...
Vincent Cunliffe
Ben did a first class job on our project. He conducted an in-depth site visit, drew up detailed plans and liaised with the bu...
Francesca Makey
Ben provided a great service in getting plans for our loft conversion. Thanks!
Cliff Stacey
Ben is a very personable, knowledgeable and reliable young man. He kept us informed every step of the way during the process ...
Mr Modsiw78
Excellent service & would highly recommend. Always available to offer advice & explain the process & always on the end of the...
paul johnson
Ben drew up the plans for our lovely kitchen extension. He did a brilliant job, producing just what we needed and he also lia...
Chris F
We were really pleased with the drawings Ben did for our house extension. He was always fast to respond to questions, flexibl...
Hassan Khan
Was brilliant in implementing our ideas into reality, went to numerous other firms and architects who had required deposits t...
John Gilliver
Would highly recommend using this company, Ben was really helpful and made everything simple for us to complete our project ....
Carl Foxx
I have had a nightmare with my architect and contacted Ben as a last resort in hope of help. Messaged him at 9am and by 13:00...
alex hsufc
Very good communication all the way through the process of design and build. Always happy to help with any queries even after...
Michael Collyer
Extension Plans Sheffield have provided me with a professional and efficient service so far. They are always ready to answer ...
Jamie Smith
Very helpful with a professional approach. Dealt with everything to do with planning application which made it so easy for us...
Giles Moore
Fantastic to work with Ben, highly recommend them for any extension plans. They not only delivered everything really quickly ...
Planning a single storey rear extension?
Choose our experienced and reputable professionals at Extension Plans Sheffield to ensure that your single storey rear extension is beautifully designed and enhances your living space.
If you’re looking for expert guidance on planning your extension, contact our team in Sheffield today!
FAQs
Do I need planning permission for a single-storey extension?
Can I extend across the full width of my home?
What can I include in my extension?
How do you design for good natural light?
Can you help if my property is in a conservation area?
How detailed are your drawings?
Will my neighbours be consulted?
Can I live at home during the build?
Can you help with building regulations approval?