The brief was to open up the rear of the house to form a modern kitchen, dining and lounge area suitable for family life and entertaining. The completed single-storey extension provides a spacious, light-filled interior with wide sliding doors leading out onto a raised paved terrace, creating a seamless connection between the home and garden.

 

Bright, Functional Living Space

Open-Plan Kitchen Extension with a Dining and Lounge Area:
The new layout combines the kitchen, dining and living spaces into one area, improving natural light throughout the room. Roof lanterns and full-width glazing bring daylight deep into the house, creating a comfortable and versatile setting for everyday use.

Connection to the Garden:
Large aluminium sliding doors span the full width of the extension, opening onto a new raised terrace formed with stone-faced retaining walls and steps down to the garden. This provides an attractive and practical outdoor space that can be used all year round.

High-Quality Detailing:
The extension uses a warm flat roof with integrated roof lanterns, maximising height and light. On the outside of the property, a smooth rendered finish ties the new structure to the existing house, while the terrace paving and retaining wall create a strong, cohesive rear elevation.

Structural Alterations:
Several internal load-bearing walls were removed to form the open-plan layout. Structural steelwork was designed and installed in accordance with engineering calculations to ensure stability, compliance and a flush ceiling line throughout.

 

Planning Permission and Building Regulations Approval

The full set of planning permission and building regulations drawings were prepared and submitted as part of the design process. Detailed plans, elevations and sections were provided to demonstrate compliance with current Building Regulations, covering structure, insulation, ventilation and drainage.

Accurate, compliant drawings ensured a smooth approval process and provided the builder with clear information for construction and inspection.

This project highlights how well-prepared house extension drawings can streamline both the approval and build stages of a Sheffield extension plans project, delivering practical, high-quality results.

 

A Modern Home for Everyday Living

The finished extension has transformed the rear of the property, providing an open space with improved light and bettering access to the garden. By combining considered design with clear, compliant home extension drawings, the project demonstrates how a single-storey rear extension can significantly enhance both the functionality and feel of a home in Sheffield.

Project Plans

Project Plans
Project Plans
Project Plans

Project Gallery

Single-Storey Rear Extension – Sheffield S10, Fulwood Area
Single-Storey Rear Extension – Sheffield S10, Fulwood Area
Single-Storey Rear Extension – Sheffield S10, Fulwood Area
Single-Storey Rear Extension – Sheffield S10, Fulwood Area
Single-Storey Rear Extension – Sheffield S10, Fulwood Area
Single-Storey Rear Extension – Sheffield S10, Fulwood Area
Single-Storey Rear Extension – Sheffield S10, Fulwood Area
Single-Storey Rear Extension – Sheffield S10, Fulwood Area
Extension Plans Sheffield

See Similar

Single-Storey Rear Extension – Sheffield S10, Fulwood Area thumbnail image

Single-Storey Rear Extension – Sheffield S10, Fulwood Area

Single-Storey Rear Extension – Shef...

View Case Study
Single Storey Rear Extension – Sheffield S26 thumbnail image

Single Storey Rear Extension – Sheffield S26

Single Storey Rear Extension – Shef...

View Case Study
Two-Storey Side and Single-Storey Rear Extension – Sheffield S7, Millhouses thumbnail image

Two-Storey Side and Single-Storey Rear Extension – Sheffield S7, Millhouses

Two-Storey Side and Single-Storey Rea...

View Case Study
Case Studies

What Our Customers Say

Reviewer Name

qunhong song

Ben is very knowledgeable with what he does with his job . He has shown his professionalism through out the planning permissi...

Reviewer Name

Ian Patheyjohns

Ben was very friendly and helpful during the development stage, giving advice where required and producing a design that met ...

Reviewer Name

Ann S

Ben was really helpful and gave us lots of advice and ideas when designing our extension. He was patient and incredibly knowl...

Reviewer Name

Duncan White

Ben did a fantastic job preparing and submitting plans for the issuing of a certificate of legal development on a house I hav...

Reviewer Name

Oliver Leyland

Ben designed our loft conversion earlier this year. I can highly recommend his services. He is knowledgeable, polite, helpful...

Reviewer Name

David Evans

Great service from start to finish with regular updates and help always at hand.

Reviewer Name

Becky Virgo

Ben at Sheffield’s Extension Design has been really helpful, he listened to my quirky design ideas and tried to incorporate...

Reviewer Name

Nick Gascoyne

Brilliant from start to finish. Helped us through every stage offer support, assistance and advice. Highly knowledgeable and ...

Reviewer Name

Ty

I would highly recommend Extension Plans Sheffield for Architect Plans. They are totally professional, helpful and follow th...

Reviewer Name

Mohammed Hussain

Fantastic Architect – Highly Recommend! We worked with Ben over a long period and honestly couldn’t have asked for a bet...

Reviewer Name

Jenny Cork

Brilliant service. Ben was highly communicative and listened to all my ideas and thoughts before coming up with excellent des...

Reviewer Name

Vincent Cunliffe

Ben did a first class job on our project. He conducted an in-depth site visit, drew up detailed plans and liaised with the bu...

Reviewer Name

Francesca Makey

Ben provided a great service in getting plans for our loft conversion. Thanks!

Reviewer Name

Cliff Stacey

Ben is a very personable, knowledgeable and reliable young man. He kept us informed every step of the way during the process ...

Reviewer Name

Mr Modsiw78

Excellent service & would highly recommend. Always available to offer advice & explain the process & always on the end of the...

Reviewer Name

paul johnson

Ben drew up the plans for our lovely kitchen extension. He did a brilliant job, producing just what we needed and he also lia...

Reviewer Name

Chris F

We were really pleased with the drawings Ben did for our house extension. He was always fast to respond to questions, flexibl...

Reviewer Name

Hassan Khan

Was brilliant in implementing our ideas into reality, went to numerous other firms and architects who had required deposits t...

Reviewer Name

John Gilliver

Would highly recommend using this company, Ben was really helpful and made everything simple for us to complete our project ....

Reviewer Name

Carl Foxx

I have had a nightmare with my architect and contacted Ben as a last resort in hope of help. Messaged him at 9am and by 13:00...

Reviewer Name

alex hsufc

Very good communication all the way through the process of design and build. Always happy to help with any queries even after...

Reviewer Name

Michael Collyer

Extension Plans Sheffield have provided me with a professional and efficient service so far. They are always ready to answer ...

Reviewer Name

Jamie Smith

Very helpful with a professional approach. Dealt with everything to do with planning application which made it so easy for us...

Reviewer Name

Giles Moore

Fantastic to work with Ben, highly recommend them for any extension plans. They not only delivered everything really quickly ...

Reviewer Name

qunhong song

Ben is very knowledgeable with what he does with his job . He has shown his professionalism through out the planning permissi...

Reviewer Name

Ian Patheyjohns

Ben was very friendly and helpful during the development stage, giving advice where required and producing a design that met ...

Reviewer Name

Ann S

Ben was really helpful and gave us lots of advice and ideas when designing our extension. He was patient and incredibly knowl...

Reviewer Name

Duncan White

Ben did a fantastic job preparing and submitting plans for the issuing of a certificate of legal development on a house I hav...

Reviewer Name

Oliver Leyland

Ben designed our loft conversion earlier this year. I can highly recommend his services. He is knowledgeable, polite, helpful...

Reviewer Name

David Evans

Great service from start to finish with regular updates and help always at hand.

Reviewer Name

Becky Virgo

Ben at Sheffield’s Extension Design has been really helpful, he listened to my quirky design ideas and tried to incorporate...

Reviewer Name

Nick Gascoyne

Brilliant from start to finish. Helped us through every stage offer support, assistance and advice. Highly knowledgeable and ...

Reviewer Name

Ty

I would highly recommend Extension Plans Sheffield for Architect Plans. They are totally professional, helpful and follow th...

Reviewer Name

Mohammed Hussain

Fantastic Architect – Highly Recommend! We worked with Ben over a long period and honestly couldn’t have asked for a bet...

Reviewer Name

Jenny Cork

Brilliant service. Ben was highly communicative and listened to all my ideas and thoughts before coming up with excellent des...

Reviewer Name

Vincent Cunliffe

Ben did a first class job on our project. He conducted an in-depth site visit, drew up detailed plans and liaised with the bu...

Reviewer Name

Francesca Makey

Ben provided a great service in getting plans for our loft conversion. Thanks!

Reviewer Name

Cliff Stacey

Ben is a very personable, knowledgeable and reliable young man. He kept us informed every step of the way during the process ...

Reviewer Name

Mr Modsiw78

Excellent service & would highly recommend. Always available to offer advice & explain the process & always on the end of the...

Reviewer Name

paul johnson

Ben drew up the plans for our lovely kitchen extension. He did a brilliant job, producing just what we needed and he also lia...

Reviewer Name

Chris F

We were really pleased with the drawings Ben did for our house extension. He was always fast to respond to questions, flexibl...

Reviewer Name

Hassan Khan

Was brilliant in implementing our ideas into reality, went to numerous other firms and architects who had required deposits t...

Reviewer Name

John Gilliver

Would highly recommend using this company, Ben was really helpful and made everything simple for us to complete our project ....

Reviewer Name

Carl Foxx

I have had a nightmare with my architect and contacted Ben as a last resort in hope of help. Messaged him at 9am and by 13:00...

Reviewer Name

alex hsufc

Very good communication all the way through the process of design and build. Always happy to help with any queries even after...

Reviewer Name

Michael Collyer

Extension Plans Sheffield have provided me with a professional and efficient service so far. They are always ready to answer ...

Reviewer Name

Jamie Smith

Very helpful with a professional approach. Dealt with everything to do with planning application which made it so easy for us...

Reviewer Name

Giles Moore

Fantastic to work with Ben, highly recommend them for any extension plans. They not only delivered everything really quickly ...

Are you considering a single-storey extension?

Are you considering a single-storey extension?

Get in touch with us today to find out how we can help you with your future project.

Get a Quote

FAQs

Do I need planning permission for a single-storey extension?

Can I extend across the full width of my home?

What can I include in my extension?

How do you design for good natural light?

Can you help if my property is in a conservation area?

How detailed are your drawings?

Will my neighbours be consulted?

Can I live at home during the build?

Can you help with building regulations approval?