Built with Marshalls Cromwell Rustic stone, roof tiles and detailing to match the main house, the extension blends seamlessly with the existing structure. French doors open onto the garden, allowing natural light and easy access while maintaining privacy and practicality.
Functional, Accessible Living Space
Additional Ground-Floor Bedroom and Shower Room:
The new accommodation provides a comfortable, accessible space ideal for guests or family members requiring ground-floor living. The internal layout was carefully planned to make the best use of the available footprint and provide a fully self-contained arrangement.
Coordinated Design and Detailing:
To maintain consistency with the original building, external materials were selected to match the existing stonework, roof tiles, fascia and soffits. This ensures a visually cohesive finish and preserves the character of the property within the surrounding Sheffield area.
Natural Light and Garden Access:
French doors provide direct access to the garden, enhancing daylight and offering a strong visual link between the interior and outdoor space.
Technical Design and Compliance:
The drawings and specification were produced to meet Building Regulations approval for structure, insulation, drainage, and fire safety. The final design ensures a robust, compliant and energy-efficient extension that adds long-term value and functionality.
Planning Permission – Larger Home Extension Process
This project required planning permission under the Larger Home Extension process, as the extension depth exceeded the limits of standard Permitted Development. The planning drawings prepared for the application illustrated the scale, design, and materials of the proposal and were submitted to the Local Planning Authority for neighbour consultation and approval.
For homeowners interested in extending under this route, more details about the Larger Home Extension process in Sheffield are available in our blog on larger home extensions, explaining how the Prior Approval procedure works and what to expect during the process.
Planning and Building Regulations Drawings – Sheffield
All planning permission and building regulations drawings for this project were prepared as part of a complete design package. The extension plans included scaled floor plans, elevations, and detailed construction notes demonstrating compliance with the relevant sections of the Building Regulations.
Producing accurate, compliant drawings helps streamline the approval process and supports a smooth build on site, showing how professional house extension drawings can save time, reduce risk, and ensure quality outcomes.
A Seamless and Practical Addition
The finished single-storey rear extension provides valuable extra living space designed for comfort, accessibility and independence. With careful attention to materials, proportions and compliance, the project demonstrates how high-quality home extension drawings and planning permission plans can deliver practical and attractive results that integrate perfectly with the existing home.
Project Plans
Project Gallery
Single-Storey Rear Extension – Sheffield S10, Fulwood Area
Single-Storey Rear Extension – Shef...
View Case Study
Two-Storey Side and Single-Storey Rear Extension – Sheffield S7, Millhouses
Two-Storey Side and Single-Storey Rea...
View Case StudyWhat Our Customers Say
qunhong song
Ben is very knowledgeable with what he does with his job . He has shown his professionalism through out the planning permissi...
Ian Patheyjohns
Ben was very friendly and helpful during the development stage, giving advice where required and producing a design that met ...
Ann S
Ben was really helpful and gave us lots of advice and ideas when designing our extension. He was patient and incredibly knowl...
Duncan White
Ben did a fantastic job preparing and submitting plans for the issuing of a certificate of legal development on a house I hav...
Oliver Leyland
Ben designed our loft conversion earlier this year. I can highly recommend his services. He is knowledgeable, polite, helpful...
David Evans
Great service from start to finish with regular updates and help always at hand.
Becky Virgo
Ben at Sheffield’s Extension Design has been really helpful, he listened to my quirky design ideas and tried to incorporate...
Nick Gascoyne
Brilliant from start to finish. Helped us through every stage offer support, assistance and advice. Highly knowledgeable and ...
Ty
I would highly recommend Extension Plans Sheffield for Architect Plans. They are totally professional, helpful and follow th...
Mohammed Hussain
Fantastic Architect – Highly Recommend! We worked with Ben over a long period and honestly couldn’t have asked for a bet...
Jenny Cork
Brilliant service. Ben was highly communicative and listened to all my ideas and thoughts before coming up with excellent des...
Vincent Cunliffe
Ben did a first class job on our project. He conducted an in-depth site visit, drew up detailed plans and liaised with the bu...
Francesca Makey
Ben provided a great service in getting plans for our loft conversion. Thanks!
Cliff Stacey
Ben is a very personable, knowledgeable and reliable young man. He kept us informed every step of the way during the process ...
Mr Modsiw78
Excellent service & would highly recommend. Always available to offer advice & explain the process & always on the end of the...
paul johnson
Ben drew up the plans for our lovely kitchen extension. He did a brilliant job, producing just what we needed and he also lia...
Chris F
We were really pleased with the drawings Ben did for our house extension. He was always fast to respond to questions, flexibl...
Hassan Khan
Was brilliant in implementing our ideas into reality, went to numerous other firms and architects who had required deposits t...
John Gilliver
Would highly recommend using this company, Ben was really helpful and made everything simple for us to complete our project ....
Carl Foxx
I have had a nightmare with my architect and contacted Ben as a last resort in hope of help. Messaged him at 9am and by 13:00...
alex hsufc
Very good communication all the way through the process of design and build. Always happy to help with any queries even after...
Michael Collyer
Extension Plans Sheffield have provided me with a professional and efficient service so far. They are always ready to answer ...
Jamie Smith
Very helpful with a professional approach. Dealt with everything to do with planning application which made it so easy for us...
Giles Moore
Fantastic to work with Ben, highly recommend them for any extension plans. They not only delivered everything really quickly ...
qunhong song
Ben is very knowledgeable with what he does with his job . He has shown his professionalism through out the planning permissi...
Ian Patheyjohns
Ben was very friendly and helpful during the development stage, giving advice where required and producing a design that met ...
Ann S
Ben was really helpful and gave us lots of advice and ideas when designing our extension. He was patient and incredibly knowl...
Duncan White
Ben did a fantastic job preparing and submitting plans for the issuing of a certificate of legal development on a house I hav...
Oliver Leyland
Ben designed our loft conversion earlier this year. I can highly recommend his services. He is knowledgeable, polite, helpful...
David Evans
Great service from start to finish with regular updates and help always at hand.
Becky Virgo
Ben at Sheffield’s Extension Design has been really helpful, he listened to my quirky design ideas and tried to incorporate...
Nick Gascoyne
Brilliant from start to finish. Helped us through every stage offer support, assistance and advice. Highly knowledgeable and ...
Ty
I would highly recommend Extension Plans Sheffield for Architect Plans. They are totally professional, helpful and follow th...
Mohammed Hussain
Fantastic Architect – Highly Recommend! We worked with Ben over a long period and honestly couldn’t have asked for a bet...
Jenny Cork
Brilliant service. Ben was highly communicative and listened to all my ideas and thoughts before coming up with excellent des...
Vincent Cunliffe
Ben did a first class job on our project. He conducted an in-depth site visit, drew up detailed plans and liaised with the bu...
Francesca Makey
Ben provided a great service in getting plans for our loft conversion. Thanks!
Cliff Stacey
Ben is a very personable, knowledgeable and reliable young man. He kept us informed every step of the way during the process ...
Mr Modsiw78
Excellent service & would highly recommend. Always available to offer advice & explain the process & always on the end of the...
paul johnson
Ben drew up the plans for our lovely kitchen extension. He did a brilliant job, producing just what we needed and he also lia...
Chris F
We were really pleased with the drawings Ben did for our house extension. He was always fast to respond to questions, flexibl...
Hassan Khan
Was brilliant in implementing our ideas into reality, went to numerous other firms and architects who had required deposits t...
John Gilliver
Would highly recommend using this company, Ben was really helpful and made everything simple for us to complete our project ....
Carl Foxx
I have had a nightmare with my architect and contacted Ben as a last resort in hope of help. Messaged him at 9am and by 13:00...
alex hsufc
Very good communication all the way through the process of design and build. Always happy to help with any queries even after...
Michael Collyer
Extension Plans Sheffield have provided me with a professional and efficient service so far. They are always ready to answer ...
Jamie Smith
Very helpful with a professional approach. Dealt with everything to do with planning application which made it so easy for us...
Giles Moore
Fantastic to work with Ben, highly recommend them for any extension plans. They not only delivered everything really quickly ...
Planning a single storey rear extension?
At Extension Plans Sheffield, we ensure that your single storey extentsions are beautifully designed to enhance any living space.
If you’re looking for expert guidance on planning your extension, contact us today!
FAQs
Do I need planning permission for a loft conversion
Where do loft conversion stairs go?
How much head height do I need for a loft conversion?
How long does the design and approval process take?
What will be included on the loft conversion plans?
Do you provide structural calculations and steelwork details?
What if my loft isn’t suitable for conversion?